The water well contractor has completed the reinstallation of the down-hole well equipment. The large drilling rig will be demobilized and removed from the site this week. After the drilling rig is removed, the contractor will develop the well, a process that will take approximately two weeks and will involve intermittent operations, most notably one pumping test that must run for 30 hours continuously. The noise generated from this activity should be significantly less than the previous operations.
If you have any questions, please contact Kevin Gilligan with BGE, Inc. (District Engineer for HCMUD 412 and HCMUD 504) at 713-488-8192.
Please monitor the Harris County MUD 412 website for future updates.